Note
It is not possible to have more than max quantity (often 1) of an operation or package in a list. If the max quantity is already reached when adding and item, this is indicated with a notification.
In the search field, you can search for a body operation by entering the operation number or a search string. Perform
the search by clicking the icon. The search function also supports search by key words.
Below the search function, the body operations are presented in a tree structure, structured in categories. Each category
in the tree structure can be expanded by clicking the icon or double clicking the function group until you find the final category you are looking for.
When a search has been performed or a final category is selected from the tree structure, a list of operations is presented in the right-hand panel.
The list is structured in the following columns:
Column |
Description |
---|---|
Operation No. |
Operation number. |
Description |
Short description of the operation. |
Variant Desc |
Variant description, e.g. XC90 D5244TX. |
Skill |
Skill level required to perform the operation, e.g. 2. See the article Standard of technical competencies for further information. |
VST |
Volvo Standard Time. For further information, see Volvo Standard Time (VST). |
Max Qty. |
Many operations have a max quantity limit (often 1). It is not possible to add a variant of an operation to a work list if the maximum quantity of the operation is exceeded. |
Labour Cost |
Labour rate of the operation. |
Packages |
If there is a package available for an operation, this is indicated with a Please note the following:
|
Select operation(s) to add by using the checkboxes on the left-hand side of each row in the list. From the drop-down menu below the list, you can select the list you want to add the operation(s) to. You can also select to create a new one. Retrieve a quick view of a list by clicking
. When desired list is selected, click the button to add the operation(s).Note
Note
It is not possible to have more than max quantity (often 1) of an operation or package in a list. If the max quantity is already reached when adding and item, this is indicated with a notification.