Collapse all
Expand all
 

Accessories

On this page you can search and add operations for new installations to a work list. The page has two main sections:

 
Fig. 67: Accessories operations page

The time to download software is included in the accessory installation operations whenever needed.

1. Search and tree structure panel

In the search field, you can search for am accessories operation by entering the operation number or a search string. Perform the search by clicking the icon. The search function also supports search by key words.

Below the search function, the accessories operations are presented in a tree structure, structured by function group. Each function group in the tree structure can be expanded by clicking the icon until you find the right function.

2. List of operations

When a search has been performed or a function is selected from the tree structure, a list of operations is presented in the right-hand panel.

 
Fig. 68: List of accessories operations
 

The list is structured in the following columns:

Column

Description

Operation No.

Operation number.

Description

Short description of the operation.

Variant Desc

Variant description, e.g. XC90 D5244TX.

Skill

Skill level required to perform the operation, e.g. 2. See the article Standard of technical competencies for further information.

VST

Volvo Standard Time. For further information, see Volvo Standard Time (VST).

Max Qty.

Many operations have a max quantity limit (often 1). It is not possible to add a variant of an operation to a work list if the maximum quantity of the operation is exceeded.

Labour Cost

 

Packages

If there is a package available for an operation, this is indicated with a icon. By clicking this icon, a pop-up is opened from which you can see details of the package and add it to a work list. Parts included in the package can be added separately to a work list or parts list, if desired.

Please note the following:

  • If you add a package to a work list, the operation and parts are automatically included.

  • If you add an operation to a work list, the package is not automatically included.

  • There is often a max quantity limit (1) for each package you add to a work list.

Select operation(s) to add by using the checkboxes on the left-hand side of each row in the list. From the drop-down menu below the list, you can select the list you want to add the operation(s) to. You can also select to create a new one. Retrieve a quick view of a list by clicking View List. When desired list is selected, click the Add to List button to add the operation(s).

Note

Note

It is not possible to have more than max quantity (often 1) of an operation or package in a list. If the max quantity is already reached when adding and item, this is indicated with a notification.